01Kehong · Finished packaging

Corrugated Shipping Boxes

Regular slotted corrugated cartons for transport, storage and fulfillment.

OEM / ODMFoshan, Guangdong, China

Corrugated Shipping Boxes

02Overview

Start with your project requirements

Shipping box dimensions, board construction, closure, stacking and packing sequence are confirmed from the delivery requirement.

Popular structures and formats

Use these formats to discuss your brief. Include a reference image; construction and availability are confirmed for your project.

01Regular slotted carton
02Custom shipping carton
03Multi-item shipping box

05Customization and applications

Corrugated Shipping Boxes: selection and sample review

Build the brief around the packed load

For bulk dispatch or warehouse transit, share item arrangement, total packed weight and all internal components. Distinguish usable internal dimensions from external carton dimensions needed for pallets or carriers.

Select board against the transit conditions

Describe stacking, handling, moisture exposure and the delivery route. Corrugated construction and any strength testing need project agreement; a flute name or wall description alone is not a load rating.

Check the complete sealed carton

Review the closure, tape areas, labels and shipping marks with the packed sample. Confirm the agreed handling or transit checks using the contents and inserts, then record the board and packing specification for quotation.

Corrugated Shipping Boxes: what to include in your enquiry

Use these points to describe your requirements. For undecided details, write Not sure / Need recommendation and share the intended use or a reference photo to start the discussion. Specifications, materials and finishes are confirmed after project review.

Packed contents and carton size
Share item dimensions, count, total packed weight and required internal dimensions.
Transit and stacking
Describe stacking, delivery route, handling conditions and any required transport testing.
Material and surface requirements
Send a preferred material or sample, if available. Board grade, coating and finish are confirmed after reviewing the intended use.
Printing and artwork
Share your logo or artwork, print areas, colours and finish reference. Feasibility is checked with the selected construction.
Quantity and delivery
Include the requested quantity, packing needs, destination and target date. MOQ, price, sample fees, sampling arrangements and actual lead time are confirmed in the quotation.

From brief to sample and quotation

  1. Share what you know

    Start with the intended use, product dimensions or a reference photo, quantity and destination where known. For undecided material, structure or finish, write Not sure / Need recommendation and describe the result you need.

  2. Agree the sample and review points

    A structural sample checks fit and handling; artwork or finish proofs check presentation. Agree the required sample type, material, review criteria, sample fees and timing before arranging that stage.

  3. Confirm the quotation scope

    Confirm the selected specification, artwork status, quantity, delivery destination and packing form. MOQ, price and actual lead time remain subject to the quotation; flag any required contact-use documentation or testing for separate review.

Selection and quotation FAQs

How is the board construction selected?

Provide packed weight, stacking conditions and protection requirements. Board construction and any performance testing are agreed for the project rather than inferred from the image.

Should my drawing show inside or outside dimensions?

Label which measurement you provide and include both constraints when relevant. The contents determine usable internal space; pallet fit and carrier limits may constrain the outside.

Are the dimensions and MOQ fixed?

These pages describe packaging types for project review. Send the dimensions and quantity you need; final specifications and MOQ are confirmed in the quotation.

07Project collaboration

Send dimensions, drawings and a reference image

We will review structure, material, print and delivery requirements before confirming the next step.