01Manufacturing and service capabilities

Turn your packaging brief into a quote-ready specification.

Use this guide to prepare material, GSM, structure, sampling, quantity, destination, and document requirements before requesting a quote.

OEM / ODMMOQ by projectFoshan, Guangdong, China

02Quote preparation

Four inputs that make a quote move faster.

Quote requirements

Share the product use, dimensions, material or GSM target, quantity, and destination market.

Material and GSM

Paper grade, coating, board construction, and converting requirements are reviewed together.

Sampling and OEM / ODM

Drawings, dimensions, folds, printing, and finishing can be confirmed through project samples.

Export packing and documents

Packing method, shipment preparation, and available project documents are confirmed before dispatch.

03Procurement checkpoints

The checklist every project runs through.

MOQ by project

MOQ depends on the material, structure, converting method, and production setup.

Sample review

Structural fit and key specifications are reviewed before batch production.

Quality checkpoints

Material, dimensions, finish, and packing requirements are checked at relevant stages.

Destination requirements

Tell us the destination market and any food-contact or documentation requirements for review.

04Project process

Five stages from brief to shipment.

01

Requirements

02

Specification

03

Production

04

Inspection

05

Shipment