01Controlled production
From material confirmation to finished packaging.
Each project connects material, structure, converting, and inspection requirements to a clear production stage.
02Production stages
Six stages carry the brief through the line.




- 01
Material confirmation
Confirm paper grade, GSM, coating, dimensions, and the intended packaging structure.
- 02
Cutting and slitting
Set material width, feed direction, and layout requirements for the next converting stage.
- 03
Board converting
Match board construction, flute direction, and required strength to the approved structure.
- 04
Die-cutting and creasing
Check the cutting form, dimensional fit, fold sequence, and assembly requirements.
- 05
Lamination and finishing
Apply the confirmed lamination, coating, or finishing requirement for the product.
- 06
Inspection, packing, and shipment
Review key dimensions, surface finish, packing method, and shipment preparation.
03Start a packaging project
Put your spec and market on the same line.
Send dimensions, material, and quantity, and the Kehong team replies with the next step for sampling or a quotation.